Categories
Previous Low-Level Buildings

170 THQ Commercial and Childcare Project

170 THQ Commercial and Childcare Project

2018 – Wallace managed the Structural Build for our long time clients, Stratum on this 3 story commercial and childcare development in Thorndon Quay. With no piles required we formed and poured over 700m3 of concrete in the foundations of this solid building which is 130% of the building code. 20T concrete panels were formed and installed around the buildings perimter and the floors were formed using ComFlor 80 supplied and installed by our Wellington Studwelders division (www.wellingtonstudwelders.co.nz)