2014 – Wallace Building Contractors was contracted by LT McGuinness to install Comflor 210 to the Level 7 Podium of the PWC Building. Huge structural steel braces have been installed under the existing interspan floor system which is being removed and replaced with a Comflor 210 concrete floor system. Over two thousand 200mm long shear studs were site welded by WBC onto the beams after the Comflor was installed. All work is took place in a live working carpark building with minimal disruption to the PWC building tenants.