2014 – Wallace was contracted by Maycroft Construction for the manufacture and installation of the precast panels for this new build in Petone. Due to the large infrastructure projects underway in Wellington Maycroft could not find a precast yard able to produce the panels to meet the tight program. WBC proposed to form the panels onsite on an area of slab and are nearing completion of the 52 panels. Wallace also constructed the mezzanine floor of the building which includes large 350mm thick insitu cantilevered slabs.