The Brief
Wallace Building Contractors delivered the complete concrete package for the new Wellington Airport Fire Station, a critical infrastructure project designed to remain operational following a major earthquake or emergency event.
Constructed to Importance Level 4 (IL4) standards, the project required highly engineered concrete works, including heavily reinforced foundations, structural slabs, apron slabs adjacent to the airfield, and extensive external concrete and landscaping works. The project also included the construction of public spaces surrounding the facility, contributing to both the operational and community aspects of the development.
